Proof of Insulation

What's behind your walls?

As a contractor, you're liable for work you can't always see.

Photographic proof at every phase. Be protected.

Photos of every insulation phase.

You get a complete evidence trail. Without chasing anyone.

Our agent sends the subcontractor a WhatsApp message.

The subcontractor takes photos of work and materials.

All documents are timestamped and stored.

The contractor now has proof of correct installation to counter claims.

  1. 01Preparation
    Preparation: moisture reading on the brick wall before work starts
  2. 02Substrate
    Substrate: Rockwool insulation batts staged beside the stud wall
  3. 03Application
    Application: mineral wool batts installed in the metal stud wall
  4. 04Inspection
    Inspection: corridor wall protected and sealed for final delivery
  5. 05Handover
    Handover: finished wooden wall along the corridor at close-out

Every photo receives a unique hash and is anchored on a decentralised network. Tamper-proof. Timestamped. Retained for the full ten-year liability period.

Subcontractor

Free

Upload photos via WhatsApp. No account needed.

General contractor

Per project

Dashboard access. PDF export. Long-term storage.

Protect your first project.

No commitment. We walk you through the setup.

Get in touch